Description: More information about the CWSP may be found in the CWSP entitled "North Snohomish County Coordinated Water System Plan", December 2010, Presented by the Snohomish County Water Utility Coordinating Committee, found at:https://www.snohomishcountywa.gov/DocumentCenter/View/8619/Coordinated-Water-System-Plan-CWSP?bidId=~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~WAC, Chapter 248-56; WATER SYSTEM COORDINATION ACT—PROCEDURAL REGULATIONSRCW, Chapter 70.116 RCW Dispositions; PUBLIC WATER SYSTEM COORDINATION ACT OF 1977~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~RCW 70A.100.030Definitions.(1) "Coordinated water system plan" means a plan for public water systems within a critical water supply service area which identifies the present and future needs of the systems and sets forth means for meeting those needs in the most efficient manner possible. Such a plan shall include provisions for subsequently updating the plan.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~Another insightful GIS dataset called "Drinking Water Service Areas", as maintained by the WA- Department of Health on the WA State Open Data Portal, found at:https://geo.wa.gov/datasets/WADOH::drinking-water-service-areas/about~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~Snohomish County produced a CWSP map of the depicting both the Critical Water Supply Service Area and the known/verified Drinking Water Service Areas, found at:https://www.snoco.org/v1/services/Docs/SCD/PDF/PDS_Water/CWSP_North_Snohomish_County_2016update.pdf~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Copyright Text: Washington State legislators; Snohomish County, Citizens, Council, Executive, Department of Planning and Development Services, Long Range Planning Division, PDS-GIS; and the utility-focused members who serve on the Coordinated Water System Plan (CWSP) committee.
Description: The 2010 {et. al.} update{s} to the North Snohomish County Coordinated Water System Plan ( CWSP) is guided by Washington State guidelines for coordinated planning under the Public Water System Coordination Act (Chapter 70.116 RCW and Chapter 246-293 WAC). The CWSP coordinates public water provision between public water purveyors, the Snohomish Health District, and Snohomish County to meet the public drinking water supply needs of the area consistent with documented public policy. This CWSP update was prepared by the Snohomish County Water Utility Coordinating Committee (WUCC), with representatives from Snohomish County, Snohomish County PUD, the Snohomish Health District, the area water utilities, and the State Department of Health (DOH). The CWSP provides a process and strategy for the existing water utilities to define their role in a program to meet the adopted land use and projected growth strategy of the area. The regional water supply, transmission, and storage plan represents the collective views of the WUCC and integrates the documented views of other State and local governments.
Service Item Id: 7e4d733e751949c59ae1e2bd488359d5
Copyright Text: Planning & Development Services (PDS) and all the participants of CWSP.
Description: During the course of updating the latest Comprehensive Plan for the County, the Capital Facilities chapter requires a current inventory of those areas that may be serviced by wastewater treatment facilities. The data was verified by acquiring data directly from the organizations and/or examining their own Capital Facilities Plan (CFP).
Service Item Id: 7e4d733e751949c59ae1e2bd488359d5
Copyright Text: PDS, cities, municipalities, utilities, and sewer districts.